Upcoming Project
PROJECT NAME:
Protection of Right Bank of Padma River at Naria & Janjira upazilla of Shariattpur District.
MINISTRY/DIVISION:
Ministry of Water Resource
ESTABLISHMENT DEPARTMENT:
Bangladesh Water Development Board (BWDB).
DPM AUTHORITY:
Khulna Shipyard Ltd.
PROJECT PURPOSE AND GOAL (with facilities):
-
Protective work along the right bank of Padma River from km.(+)0.900 to km. (+)1.700=0.800 km & km. (+) 0.050 to km (-) 8.050=8.100 km, total = 8.900 with 89.00 end termination. 08 Nos RCC Kheya Ghat and Char Dredging in Naria & Janjira upazila of Shariatpur District.
TOTAL QUANTITY OF BLOCK:
3,247,441 blocks (135,309/month, 4,510/day).
TOTAL LAND REQUIREMENT OF PROJECT:
50 acre.
TOTAL MANPOWER INVOLVEMENT:
120 persons /day
PROJECT PERIOD :
28 Months
PROJECT COST:
1,617,626,629.00 Taka.
1
2
PROJECT NAME:
Khurushkul Special Asrayan Project.
MINISTRY/DIVISION:
Prime Minister Office
ESTABLISHMENT DEPARTMENT:
Sena Shadar, Brunch of Engineer in Chief, Public Works Directorate.
PLANNING COMMISSION DIVISION:
Agriculture, Water Resources and Rural Organization Division.
PROJECT PURPOSE AND GOAL (with facilities):
-
The project goal is Rehabilitation of Homeless families in country.
-
The Purpose of Rehabilitating The Rehabilitation landless people is to open the way for them to reduce their Poverty.
-
To normalize their standard of living by providing loan at an early stage.
-
Rehabilitation of the rehabilitated through various types of vocational training to build self-reliance.
PROJECT ENDING TIME:
June 2022
PROJECT COST:
116330.00 lac taka
3
PROJECT NAME:
Buffer Godown
MINISTRY/DIVISION:
Ministry of Industries.
ESTABLISHMENT DEPARTMENT:
Khulna Shipyard Ltd (Bangladesh Navy Organization.
PLANNING COMMISSION DIVISION:
Bangladesh Chemical Industries Corporation(BCIC).
PROJECT PURPOSE AND GOAL (with facilities):
-
The Government has Undertaken a Plan to Construct 34 Buffer Godowns in Different Districts Across the Country Aimed at Providing Facilities for Fertilizer Preservation and Distribution.
PROJECT COST:
Grand Total Cost for 10 nos Godown : 3,646,889,428.00 taka.
4
PROJECT NAME:
Savar Sports Complex
MINISTRY/DIVISION:
Ministry of Social Welfare Bangladesh
ESTABLISHMENT DEPARTMENT:
National Disable Development Foundation and Public Works Department
PLANNING COMMISSION DIVISION:
socio-economic infrastructure division
PROJECT PURPOSE AND GOAL (with facilities):
-
Provide equal rights and opportunities to people with special needs as a citizen of the society and lead a healthy normal life as part of the mainstream of the society.
-
Disable person special school, technical services, rearrange system, Sports and cultural environment buildup.
-
By 2023 have to complete 27811.70 sqm floor area 2 basement with 11th floor academic building construction.
-
By 2023 year 6th storied foundation with 6th storied dormitory and hostel block construction.
-
Special child and disable people swimming pool, gymnasium construction and develop football, cricket games facilities.
-
Surrounding boundary wall for sports complex.
-
Fair fighting system.
-
Solar panel setup.
PROJECT ENDING TIME:
JUNE 2023
PROJECT COST:
44,754.07 LAC TAKA.