top of page

Upcoming Project

Block Project

PROJECT NAME:

Protection of Right Bank of Padma River at Naria & Janjira upazilla of Shariattpur District.

MINISTRY/DIVISION:

Ministry of Water Resource

ESTABLISHMENT DEPARTMENT:                                        

Bangladesh Water Development Board (BWDB).

DPM AUTHORITY:

Khulna Shipyard Ltd.

PROJECT PURPOSE AND GOAL (with facilities):

  • Protective work along the right bank of Padma River from km.(+)0.900 to km. (+)1.700=0.800 km & km. (+) 0.050 to km (-) 8.050=8.100 km, total = 8.900 with 89.00 end termination. 08 Nos RCC Kheya Ghat and Char Dredging in Naria & Janjira upazila of Shariatpur District.

TOTAL QUANTITY OF BLOCK:

3,247,441 blocks (135,309/month, 4,510/day).

TOTAL LAND REQUIREMENT OF  PROJECT:

50 acre.

TOTAL MANPOWER INVOLVEMENT:

120 persons /day

PROJECT PERIOD :

28 Months

 

PROJECT COST:  

1,617,626,629.00 Taka.

1

Asrayan Project

2

PROJECT NAME:

Khurushkul Special Asrayan Project.

MINISTRY/DIVISION:

Prime Minister Office

ESTABLISHMENT DEPARTMENT:                                        

Sena Shadar, Brunch of Engineer in Chief, Public Works Directorate.

PLANNING COMMISSION DIVISION:

Agriculture, Water Resources  and Rural Organization Division.

PROJECT PURPOSE AND GOAL (with facilities):

  • The project goal is Rehabilitation of Homeless families in country.

  • The Purpose of Rehabilitating  The Rehabilitation landless people is to open the way for them to reduce their Poverty.

  • To normalize their standard of living by providing loan at an early stage. 

  • Rehabilitation of the rehabilitated through various types of vocational training to build self-reliance.

PROJECT ENDING TIME:

June 2022

PROJECT COST:  

116330.00 lac taka

Buffer Godown

3

PROJECT NAME:

Buffer Godown

MINISTRY/DIVISION:

Ministry of Industries.

ESTABLISHMENT DEPARTMENT:                                        

Khulna Shipyard Ltd (Bangladesh  Navy Organization.

PLANNING COMMISSION DIVISION:

Bangladesh Chemical Industries Corporation(BCIC).

PROJECT PURPOSE AND GOAL (with facilities):

  • The Government has Undertaken a Plan to Construct 34 Buffer Godowns in Different Districts Across the Country Aimed at Providing Facilities for Fertilizer Preservation and Distribution.

 

PROJECT COST:  

Grand Total Cost for 10 nos Godown : 3,646,889,428.00 taka.

4

PROJECT NAME:

Savar Sports Complex

MINISTRY/DIVISION:

Ministry of Social Welfare Bangladesh

ESTABLISHMENT DEPARTMENT:                                        

National Disable Development Foundation and Public Works Department

PLANNING COMMISSION DIVISION:

socio-economic infrastructure division

PROJECT PURPOSE AND GOAL (with facilities):

  • Provide equal rights and opportunities to people with    special needs as a citizen of the society and lead a  healthy normal life as part of the mainstream of the society.

  • Disable person special school, technical services, rearrange system, Sports and  cultural environment buildup.

  • By 2023 have to complete 27811.70 sqm floor area 2 basement with 11th floor  academic building construction.

  • By 2023 year 6th storied foundation with 6th storied dormitory and hostel block construction.

  • Special child and disable people swimming pool, gymnasium construction and develop football, cricket games facilities.

  • Surrounding boundary wall for sports complex.

  • Fair fighting system.

  • Solar panel setup.

 

PROJECT ENDING TIME:

JUNE 2023

PROJECT COST:  

44,754.07 LAC TAKA.

Savar Sports Complex
bottom of page