Civil Construction

Project Name              : HAZRAT SHAH JALAL INTERNATIONAL AIRPORT 3RD TERMINAL EXTENSION PROJECT

Main-contractor         : SAMSUNG C&T

Sub-contractor           : JINSUNG

Sub-sub-contractor   : B&F Engineering & Construction Ltd.

1. AGGREGATE STORAGE WALL CONSTRUCTION: CIVIL PART  

       We have completed aggregate storage civil work at RMC site in HSIA Extension Project. This construction includes:

  • Aggregate storage wall base casting

  • High rise wall (4.75m height) shuttering work

  • Concrete Casting

12-35-27-2.jpg
12-35-27-1.jpg
0001.jpg

2. PAVEMENT CONSTRUCTION WORK

We have completed Concrete Pavement Construction work at RMC site in HSIA Extension Project. This construction work includes:

  • Soil Compaction and leveling work

  • Rebar Fabrication work

  • Concrete casting work of approx. 3200 Sqm area.

12-45-18.jpg
12.45.18-(1).jpg

3. TRUCK SCALE CONSTRUCTION WORK

We have completed Truck Scale Construction Work at RMC site in HSIA Extension Project. This construction work includes

  • Soil Excavation & leveling work

  • Rebar Fabrication work

  • Concrete casting work.

12-52-57.jpg
WhatsApp Image 2020-08-08 at 12.52.57 (1
WhatsApp Image 2020-08-08 at 12.52.57 (2

4. Generator Room & Car Wash Construction work

We have completed Generator Room base Construction Work and Car Washer Construction work at RMC site in HSIA Extension Project. This construction work includes

  • Soil Bed preparation & leveling work

  •  Rebar Fabrication work

  • Concrete casting work.

13-2-56.jpg
12.52.57-(2).jpg
715.jpg

LABOR CAMP (ASHKONA) DRAINAGE CONSTRUCTION WORK:

RCC U-TYPE DRAIN & BOX CULVERT CONSTRUCTION

We are doing construction work of 400m U-Type (W-1m) RCC Drain and Box Culvert. This construction work includes

> Soil leveling work

> Rebar Fabrication work

> Concrete casting work.