Factory Renovation Work (Floor Dismantling & Civil work)
Client Name
:
KiDO Dhaka industrial Ltd.
Main Contractor
:
KiDO Dhaka industrial Ltd.
Work Name
:
Factory Renovation Work
Work Period
:
2022

Matarbari Ultra Super Critical Coal Fired Power Plant Project
Client Name
:
Coal Power Generation Company Bangladesh Limited
Main Contractor
:
Sumitomo/POSCO
Work Name
:
503 Meter Macadam Road (community road) in project area.
Work Period
:
2018

Matarbari Ultra Super Critical Coal Fired Power Plant Project
Client Name
:
Coal Power Generation Company Bangladesh Limited
Main Contractor
:
Sumitomo IHI-Toshiba, GC-POSCO E&C
Work Name
:
Geo-Technical Investigation, Topographical survey
Work Period
:
2017

The Construction of Kanchpur, Meghna, Gumti 2nd Bridge and Existing Bridge Rehabilitation Project (Package No. PW-01).
Client Name
:
Dept. of Roads & Highways, Ministry of Road Transport & Bridges, Government of Bangladesh.
Main Contractor
:
OSJI JV
Work Name
:
Design, Supply and Construction for Contractor’s Accommodation for Local Staff for Kanchpur, Meghna, Gumti Yard.
Work Period
:
2016

Construction of Pre-Fabricated Shelter in 14-Border Out Posts (BOP) in hill tracks area in Bangladesh.
Client Name
:
Border Guard Bangladesh, Ministry of Homes, Government of Bangladesh.
Main Contractor
:
B&F Engineering & Construction Ltd.
Work Name
:
Design, Material Supply and Construction for Contractor’s Construction of Pre-Fabricated Shelter in 14-Border Out Posts.
Work Period
:
2016

Feasibility Study on Karnaphuli Bridge Project.
Client Name
:
Korea Exim Bank
Main Contractor
:
B&F Company Ltd.
Work Name
:
Geo-Technical Investigation, Topographical survey
Work Period
:
2015

Shajalal Fertilizer Project
Client Name
:
BCIC
Main Contractor
:
Shanxi Petrochemical Engineering Co., Ltd. – SPECO
Work Name
:
Ammonia Substation(1,480m2)
Work Period
:
2014
.jpg)
Shajalal Fertilizer Project
Client Name
:
BCIC
Main Contractor
:
Chengda Engineering Co., Ltd.
Work Name
:
Internal RCC Road(Plant)
Work Period
:
2014

Mohora & Kalurghat Water Treatment Plant Rehabilitation Project.
Client Name
:
Chittagong WASA, Bangladesh, Ministry of LGED, Government of Bangladesh
Main Contractor
:
B&F Company Limited
Work Name
:
Geo-Technical Investigation Topography & Traffic Survey
Work Period
:
2014

220 MW Shajibazar Power Plant Project, Bangladesh.
Client Name
:
Shajibazar Power Plant
Main Contractor
:
China Energy - NEPC
Work Name
:
Piling & Soil Development.
Work Period
:
2014

Shajalal Fertilizer Water Inlet Project.
Client Name
:
BCIC
Main Contractor
:
Chengda Engineering Co.,
Work Name
:
Large Piping and Piping
Work Period
:
2014

Shajalal Fertilizer Water Inlet Project.
Client Name
:
BCIC
Main Contractor
:
Chengda Engineering Co.,
Work Name
:
Underground Piping
Work Period
:
2014

Far East spinning project
Client Name
:
Far East Group
Main Contractor
:
B&F E&C Limited(EPC)
Work Name
:
Underground Ducting
Work Period
:
2014

Shajalal Fartilizer Project, Bangladesh
Client Name
:
BCIC
Main Contractor
:
Shanxi Petrochemical Engineering Co., Ltd. (SPECO)
Work Name
:
Under Ground Cable Laying
Work Period
:
2014

Shajalal Fartilizer Project, Bangladesh
Client Name
:
BCIC
Main Contractor
:
China National (Chemical Eng. Co. Ltd.- CC7).
Work Name
:
Urea Substation(2,500m2)
Work Period
:
2014

Bibiyana-II, 344MW Combined Cycle Power Plant Project.
Client Name
:
Power Development Board, Bangladesh
Main Contractor
:
China Energy Eng. Group - NEPC
Work Name
:
Central Control Building (Power Plant) & Steam Turbine Structure
Work Period
:
2014